Welcome to the official website of Baoji Zhongtie Qinling Heavy Machine Co., LTD.

Sales:        0917-2820911

After sales: 0917-2820916

news

Product

Hot keywords

Contact

Baoji China railway qinling heavy industry co. LTD

sales:          0917-2820911/+8613119134964

After sales: 0917-2820916 

Email: bjqlzggs@163.com

Address: no. 28, west jiangtan road, weibin district, baoji city, shaanxi province

Website: www.ztqlzg.com

Website :  en.ztqlzg.com

The trains in the power-off section of the beijing-guangzhou line are towed by diesel locomotives

Your current location: Home >> News >> Industry information

The trains in the power-off section of the beijing-guangzhou line are towed by diesel locomotives

Date of release:2018-12-18 Author: Click:

The transport capacity of the south section of the beijing-guangzhou railway was basically restored on the evening of September 30. However, due to the interruption of power supply from hengyang to chenzhou, the electric locomotive cannot effectively pull the train forward.



According to introducing, beijing-guangzhou route of hengyang to chenzhou section after a power outage, the railway from the car in hengyang railway administration has mobilized a large number of internal combustion engine to chenzhou section of ferry type traction, which use a in front of the electric locomotive diesel engine, the diesel locomotive traction, pull the train after blackout section, unloading diesel locomotive, continue to use electric locomotive traction train moving. At present, after a few days of efforts, the basic capacity to meet the transport needs, there are 135 diesel locomotive in the beijing-guangzhou line shaoguan to zhuzhou interval set electric locomotive traction. In addition, 85 diesel locomotives and 45 diesel locomotives on sanmao line have been put into service on the beijing-kowloon line as part of the indirect train traction task. At the same time of solving the train traction power, due to the interruption of power supply, the signal lights in each station did not show, the turnout could not move, which directly led to the diesel locomotive traction train can only operate according to the hand signal, turnout to rely on manual operation, the efficiency is very low, the train running speed is very slow. The ministry of railways dispatched and purchased large generators and generators from all units of the road and sent them to the power cut section. By generating power on its own, it ensured the power consumption of railway signal machines and switches at all stations along the road, and the normal operation of signals and switches was restored.



京广线断电区段列车由内燃机车牵引运行


The address of this article:http://en.ztqlzg.com/news/401.html

Key word:Beijing-guangzhouinternalcombustionlocomotive

Recently browse:

1bbb.png

Contact

sales:          0917-2820911/+8613119134964

After sales: 0917-2820916 

Email: bjqlzggs@163.com

Address: no. 28, west jiangtan road, weibin district, baoji city, shaanxi province

Website: www.ztqlzg.com

Website :  en.ztqlzg.com 

Scan QR code

未标题-2.jpg

  • Service
  • number
    13119134964
  • Message
  • Online Service
    Please leave a message for us
    Please input the message here, and we will contact you as soon as possible.
    name
    Contacts
    Telephone
    Telephone
    mailbox
    mailbox
    address
    address