ZTY420 diesel locomotive
Technical parameters and main configuration
Execution standard
1.JB/ t3247-1991 general technical conditions for industrial and mining diesel locomotive
2.TB/ t2494.1-1994 track vehicle axle ultrasonic inspection method
3.GB/ t3314-2006 general technical conditions for diesel locomotive
4.GB/ t3450-1994 "allowable noise value of locomotive driver's cab"
5.TB/ t449-2003 outline of wheel rim tread for rolling stock
6.TB/ t1025-2000 technical conditions for hot coil coil compression springs for rolling stock
7.TB/ t1444-2002 technical conditions for rubber seals for internal combustion engines in vehicles
8.TB/1463-2006 technical conditions for locomotive wheelset assembly
9. Tb1580-1995 welding technical conditions for newly built rolling stock
10.TB/ t2441-1993 technical conditions for assembly of rolling bearing axle box of diesel locomotive
11. TB/T 2817-1997 rolling steel integral vehicle technical conditions for railway vehicles
12.TB/T 2945-1999 LZ50 steel axles and billets for railway vehicles technical conditions
一、Main configuration
The diesel engine WD12.420 hangfa (steyr) diesel engine
The transmission way Hydraulic transmission
brake Jz-7 single machine brake
Braking way Air brake and hand brake
Coupling type Locomotive 13 upper acting coupler
二、Main technical parameters
power 420 hp
Maximum tonnage of traction (straight) ) 1706 t
A top speed of 15 km/h
Through the minimum curve radius 60 m
gauge 1435 mm
The wheelbase 1800 mm
distance 5000 mm
Axial series B-B
Coupler height 880 mm±10 mm
Preparing a weight About42 t
The wheel diameter 840 mm
Car Length, Width and Height (mm) 11380×3000×3900
三、Main parameters of diesel engine
model | WD12.420G |
Number of cylinders | 6 pcs |
The cylinder diameter | 126 mm |
trip | 155 mm |
Rated power/speed | 309 kW(420hp)/2000 rpm |
Maximum torque/speed | 1820 Nm/1100~1500 rpm |
Minimum fuel consumption rate | 205 g/kW.h |
Start the way | Dc 24V electric start |
四、Main parameters of hydraulic torque converter
model | ZTY420 |
Circular diameter | 435 mm |
五、Hydraulic stepless transmission
Shift control mode | The electro-hydraulic reversing |
gear | Forward, neutral, back |
六、Air compressor
Air compressor/single air compressor | 0.57 m3/min/ET0.9 m3 |
七、Traction characteristics of traction locomotive
Traction tonnage list for traction locomotive
i (The ramp) ‰ | 0 | 6 | 12 | 18 | 24 | 30 |
speedV(km/h) | Traction weight (t) | |||||
5 | 1706 | 994 | 608 | 432 | 331 | 266 |
10 | 1558 | 610 | 368 | 257 | 194 | 153 |
15 | 902 | 345 | 202 | 136 | -- | -- |
Note: the above traction tonnage table of traction locomotive is the traction weight without curve. If there are both ramps and curves, the traction weight will decrease with the curve radius
八、Major outsourcing parts supporting manufacturers
The serial numbe | Name and model | Production factory, | To address |
1 | Diesel engine WD12.420 | Sinotruk hangzhou engine co. LTD | Hangzhou |
2 | Hydraulic torque converter TY420 | Baoji China railway construction machinery co. LTD | Shanghai |
3 | Hydraulic stepless transmission | Baoji China railway construction machinery co. LTD | Baoji |
4 | The axle of a locomotive vehicle | Taiyuan heavy industry wheel shaft co. LTD | Taiyuan |
5 | 840 ㎜ grinding wheel steel | Taiyuan heavy industry wheel shaft co. LTD | Taiyuan |
6 | Front and rear class I and II drive boxes | Baoji China railway construction machinery co. LTD | Baoji |
7 | Transmission shaft | Xu chang drive shaft co. LTD | Xuchang |
8 | Locomotive bearing box bearing | Wafangdian bearing | Wafangdian |
9 | JZ-7 Brake/Single | The ministry of railways appoints manufacturers | Shenyang/Tianjing |
10 | Air compressor | Sinotruk/xiamen jaguar | Hangzhou/Xiamen |
11 | Locomotive brake shoe | Baoji China railway construction machinery co. LTD | Baoji |
12 | Electrical control system | Baoji China railway construction machinery co. LTD | Baoji |
13 | Traction device no. 13 upper acting coupler | Shenyang brake machine factory of ministry of railways | Shenyang |
14 | Shock absorption system | Baoji China railway construction machinery co. LTD | Baoji |
15 | Bogie frame | Baoji China railway construction machinery co. LTD | Baoji |
16 | The frame | Baoji China railway construction machinery co. LTD | Baoji |
17 | Car body | Baoji China railway construction machinery co. LTD | Baoji |
九、Quality assurance and technical service
1. The warranty period is one year. The calculation starts after the locomotive is transported to the test and acceptance.
2. The supplier shall be responsible for the reliability, integrity and performance of the locomotive.
3. During the warranty period of the locomotive, the supplier shall be responsible for the defects caused by the design, process and materials of the locomotive and correct them at its own expense.
4. The supplier shall provide free training for the passenger.
5. The supplier shall provide the user manual and relevant technical data free of charge.
6. During the warranty period, if there is any problem with the locomotive, the supplier shall send someone to the site to deal with the problem within 48 hours after receiving the notice from the buyer.
7. Upon expiration of the warranty period, the supplier shall provide technical services free of charge.
ZTY420 diesel locomotive
Details of goods to be delivered on board
一、 Consumable Part List
NO. | Tool Name | Specification Model | unit | Quantity |
1 | Spare parts for engine | Sets | 1 | |
2 | Brake shoe | Pcs | 8 | |
3 | Safety valve | Pcs | 1 | |
4 | Start button | LA38-11/204 | Pcs | 1 |
5 | Air switch | 1P6A | Pcs | 1 |
6 | Air switch | 2P30A | Pcs | 1 |
7 | Air switch | 1P20A | Pcs | 1 |
8 | Brake cylinder leather bowl | 152×203 | Pcs | 2 |
9 | Universal reversing switch | LW5D-16 D0414-2 | Pcs | 2 |
10 | Horn solenoid valve | 3V 210-08 DV24V | Pcs | 1 |
二、Tool List
No. | Tool Name | Specification | unit | Quantity |
1 | Box wrench | 5.5×7 8×10 10×12 12×14 14×17 17×19 19×22 24×27 | Pcs | 8 |
2 | Open end wrench | Pcs | 8 | |
3 | Socket wrench | 12.5 ㎜ metric 32 | Sets | 1 |
4 | Adjustable wrench | 300㎜ | Pcs | 1 |
5 | Cutting pliers | 200㎜ | Pcs | 1 |
6 | Screwdriver | “十”字250㎜ | Pcs | 1 |
7 | Screwdriver | “一”字250㎜ | Pcs | 1 |
三、File List
No. | Name | unit | Quantity | Remarks |
1 | Locomotive certificate | Pcs | 1 | |
2 | Operating instruction and maintenance manuals | Pcs | 1 | |
3 | Engine document | Sets | 1 |
ZTY420 diesel locomotive